Insights
Reinforced Geomembrane Protects Wastewater Treatment Plant in Seward, AK
Learn how a reinforced ethylene copolymer geomembrane met all of the project and owner requirements at the Lowell Point wastewater treatment plant in Seward, AK.
Retention Pond Liners Withstand Missile Launches and Florida Weather
XR Geomembranes XR-5® able to withstand Florida's extreme weather at Cape Canaveral Air Force Base.
Shell Oil Selects XR-5® for Long-Term Hydrocarbon Containment
XR-5 able to withstand hydrocarbon contaminant, making XR Geomembranes the right choice for Shell Oil.
Singapore Chooses XR-5® to Solve Rampant Solid Waste Disposal Problem
XR Geomembranes assists Singapore with the largest solid waste disposal land reclamation project in the world.
Steep Side Erosion Control at Sewage Pond
U.S. Department of Interior chooses XR-5 geomembrane for wastewater impoundment needs.
Bonneville Power Chooses XR-5® for Substation Liners
Bonneville Power Administration chooses XR Geomembranes as above ground secondary containment solution.
XR-5® Seals Outflow of Wastewater at Cheese Manufacturing Facility
XR-5 Geomembrane completely seals the outflow of wastewater and protects the system
Runoff Pond Handles De-Icing Chemicals
6,000 square feet of 8130 XR-5 geomembrane is used to line the deicing chemical runoff pond at Lansing Regional Airport.
XR-5® Lines Jet Fuel Tank Farm at Denver Airport
Denver International Airport chooses XR-5 geomembrane to protect subsoil and groundwater from jet fuel containment.
Double XR-5® Liner Contains Mining Solution
Cypress Copperstone Mine on the California-Arizona border uses XR-5 geomembranes for mining needs.