XR Geomembrane Case Study: Singapore Landfill
XR Geomembranes' landfill liner solves Singapore’s rampant trash disposal problem.
How 4.5 Million Square Feet of Geomembrane Liner Solved Singapore’s Rampant Trash Disposal Problem
Nearly every city encounters the same problem: what to do with mountains of trash that have amassed. Singapore was no exception; with a population of nearly 3 million, government officials needed to find a solution to replace their current waste disposal process. Singapore then launched the largest solid waste disposal land reclamation project in the world. With environmental safety being cited as a top concern, a geomembrane designed to withstand both the long-term effects of the tropical environment as well as the rigorous installation process needed to be chosen. Queue XR-5. Fill out the form to download a printable copy of the case study.